![]() ![]() ![]() Additional intercepts up-hole from the main intercept include 62.60 g/t over 0.5m within 5.65 g/t over 8.40m between 158.0 to 166.4m on the 222 Vein.Hole SB-2021-069 is the second stepout hole located 600 metres to the northwest of previously released hole (SB-2021-025) and 400 metres from released holes SB-2021-26, 40, 48 and 55 targeting newly discovered bulk-tonnage mineralization at Pioneer. (" Talisker " or the " Company ") ( TSX:TSK)(OTCQX:TSKFF) is pleased to announce results from drill hole SB-2021-069 at its 100% owned flagship Bralorne Gold Project. TORONTO, ON / ACCESSWIRE / Septem/ Talisker Resources Ltd.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |